Sunday, April 24, 2016

Bye bye metal walls :(

Hello!
Look how far we've gotten!
Travis and I decided to do Tyvek on the inside of the trailer because we got a tip from a construction friend that when one builds a house with metal walls on the outside, they tend to freeze and sweat, causing the insulation to become wet and the paint/drywall to bubble.

We were hoping to get the framing for the walls done in two full weekends, but with the weather and how much we've been working it hasn't worked out that way. 

BUT!!... nonetheless, we are making lots of progress!

Next step will be to cut out the bathroom window, finish the rest of the framing, put in the windows, build the loft, electrical and then cut the roof and do the framing for the ceiling. And hopefully in that order!

Wish us luck!





No comments:

Post a Comment